Understanding Product Availability Check (ATP)
In B2B procurement and supply chain management, a Product Availability Check—commonly known as Available-to-Promise (ATP)—is a critical function used to provide accurate responses to customer order inquiries regarding resource availability [2]. Its primary purpose is to generate available quantities and confirm delivery due dates, allowing a company to match customer demand with its production and procurement plans [2].
Unlike a simple inventory count, which only shows what is currently on the shelf, an ATP check is dynamic. It considers not only existing stock but also future supply (receipts) and existing commitments (requirements) to determine what can actually be promised to a new order [1].
How ATP is Calculated
The ATP quantity is not a static number but a calculation based on several variables. According to SAP documentation, the system dynamically calculates the ATP quantity using the following formula components [1]:
- Stock: Current physical inventory available in the warehouse or sublocation.
- Planned Receipts: Incoming goods that are expected to arrive, such as production orders, purchase orders, and planned orders [1].
- Planned Requirements: Outgoing goods already committed to other obligations, such as existing sales orders, deliveries, and reservations [1].
By balancing these three factors, the system can determine if a specific quantity is available for a requested date, or suggest the earliest possible date when the goods will become available.
Types of ATP Strategies
ATP functions are generally classified by the strategy they use to allocate resources: push-based or pull-based [2].
Push-Based ATP
Push-based ATP relies on forecasts of future demand. Quantities and availability dates are computed based on an anticipation of what will be needed, often driven by a Master Production Schedule [2]. While this allows for proactive planning, it is limited by the accuracy of the forecasts; if the forecast is wrong, the ATP results may be inaccurate [2].
Pull-Based ATP
Pull-based models allocate resources dynamically in response to actual customer orders [2]. This approach balances forecast-driven replenishment with real-time order utilization. However, because resources are allocated as orders arrive, this method can sometimes lead to “myopic” results, where early orders consume resources that might have been more strategically used for later, higher-priority orders [2].
Practical Workflow in Procurement
The availability check is typically integrated into enterprise management software and follows a specific operational flow to ensure that shipping and procurement activities are synchronized [1].
1. Prerequisites and Setup
Before a check can be executed, certain system settings must be maintained, including:
- ATP Groups: Defined settings for how the check is performed.
- Check Control: Defining the “Scope of Check” to determine which receipts and requirements are considered [1].
- Location-Specific Masters: Assigning a check mode to specific products at specific locations [1].
2. Execution
The check can be triggered in two primary modes [2]:
- Real-Time: Driven by each individual order as it is entered.
- Batch Mode: Executed at set intervals for a group of orders accumulated over a period.
3. Output and Action
The output of the ATP check informs different departments of the necessary next steps [1]:
- Shipping: If the check is positive, the shipping department is notified to begin packing and loading.
- Production: If there is insufficient stock, production is notified to manufacture the goods.
- Procurement: If the goods must be sourced externally, sales or procurement teams are notified to create purchase orders for suppliers.
Worked Example (Illustrative)
Note: The following scenario uses illustrative numbers to demonstrate the ATP calculation logic.
Scenario: A B2B buyer requests 500 units of a specific industrial valve for delivery on November 15th.
- Current Stock: 200 units.
- Planned Receipts: A purchase order for 400 units is scheduled to arrive on November 10th.
- Planned Requirements: An existing order for 300 units is scheduled for delivery on November 5th.
Calculation:
(Current Stock: 200) + (Planned Receipts: 400) – (Planned Requirements: 300) = 300 units available.
Result: The ATP check fails for the requested 500 units. The system would notify the procurement team that a shortage of 200 units exists, triggering a new purchase order or an expedited production run to meet the November 15th deadline.
Limitations and Quality Checks
While ATP provides a powerful tool for order promising, it is subject to certain limitations:
- Data Integrity: The accuracy of an ATP check is entirely dependent on the accuracy of the data in the time series (receipts and issues) [1]. If a supplier fails to deliver a planned receipt on time, the ATP promise to the customer becomes invalid.
- Checking Horizons: Systems may use a “checking horizon,” meaning they only check availability within a certain timeframe. Orders falling outside this horizon may not be accurately confirmed [1].
- Fixed Pegging: Some systems consider fixed pegging relationships, where specific receipts are locked to specific requirements, which can restrict the flexibility of the ATP quantity [1].
FAQ
What is the difference between Gross ATP and Net ATP?
Gross ATP represents the total available supply, while Net ATP represents the supply remaining to support new demands after existing customer commitments have been subtracted.
Can ATP be used for services or only physical products?
While the provided documentation focuses on physical goods (stock, shipping, production), the general principle of ATP—matching requested demand to resource availability—can be applied to any resource-constrained capacity, including service hours.